Files
rgb-led-strip-controller/memory-bank-v2/TEST_CHECKLIST.md
T
fristy c9e643d617 Initial commit: RGB LED Strip Controller v0.3.0
- WPF + WinRT BLE controller for ELK-BLEDOM compatible LED strips

- Multi-device control, effects, grayscale and temperature modes

- Velopack updates via Gitea Releases, Gitea Actions CI
2026-09-04 23:31:11 +03:00

989 B

Memory Bank v2 Test Checklist

1. Startup Test (2-3 minute orientation)

  • Read only Layer 0 files.
  • Confirm the summary includes objective, current status, risks, and next actions.
  • Pass if no Layer 1/2 file is required for a basic project brief.

2. Scale Test (200+ task logs)

  • Ensure core files remain within hard budgets.
  • Confirm old details are reachable through task logs and digests.
  • Pass if context load time remains fast and no core file turns into a log.

3. Audit Trace Test

  • Pick one decision and trace:
    1. Core summary mention
    2. ADR rationale
    3. Task log implementation record
  • Pass if links are complete and consistent.

4. Anti-duplication Test

  • Scan core files for repeated long paragraphs.
  • Pass if repeated content is replaced with canonical links.

5. Compaction Test

  • Run compact memory bank procedure.
  • Confirm:
    • Core files shrink to budget.
    • 90+ day history appears in monthly digests.
    • Link integrity is preserved.