- WPF + WinRT BLE controller for ELK-BLEDOM compatible LED strips - Multi-device control, effects, grayscale and temperature modes - Velopack updates via Gitea Releases, Gitea Actions CI
49 lines
1.7 KiB
Markdown
49 lines
1.7 KiB
Markdown
# Memory Bank v2 Operations
|
|
|
|
## Command: `update memory bank`
|
|
|
|
Use this when significant changes happen or context gets stale.
|
|
|
|
### Procedure
|
|
1. Read Layer 0 (`00_project_snapshot.md`, `20_now.md`, `21_backlog.md`).
|
|
2. Read additional Layer 1 and Layer 2 files that are relevant to touched work.
|
|
3. Refresh core files to current truth.
|
|
4. Write or update ADRs for durable decisions.
|
|
5. Write a task log for significant implementation steps.
|
|
6. Validate:
|
|
- All referenced ADR and task IDs exist.
|
|
- Core files do not contain changelog-style history.
|
|
- Budgets from `SCHEMA.md` are respected.
|
|
7. Update `Last Updated` fields in touched files.
|
|
|
|
### Expected Result
|
|
- Layer 0 gives an accurate project state in minutes.
|
|
- Decision and execution history is traceable via IDs.
|
|
|
|
## Command: `compact memory bank`
|
|
|
|
Use this manually for maintenance.
|
|
|
|
### Triggers
|
|
- Any file exceeds hard budget.
|
|
- Backlog has many stale completed items.
|
|
- Task logs older than 90 days are accumulating.
|
|
|
|
### Procedure
|
|
1. Identify oversized core files.
|
|
2. Remove historical narrative from core files.
|
|
3. Ensure old details live in ADR/task logs.
|
|
4. For each month older than 90 days, create or refresh `logs/digests/YYYY-MM.md`.
|
|
5. Replace verbose old references in core files with digest links.
|
|
6. Re-validate ID/link integrity and budgets.
|
|
|
|
### Expected Result
|
|
- Core remains concise.
|
|
- Older history stays discoverable through digests and linked logs.
|
|
|
|
## Consistency Checklist
|
|
- Every backlog item has an ID, status, and owner.
|
|
- Every ADR has status (`proposed`, `accepted`, `superseded`) and links.
|
|
- `20_now.md` and `21_backlog.md` do not conflict.
|
|
- `00_project_snapshot.md` reflects the same priorities as `20_now.md`.
|